
Gode Wind 3 – Offshore Mechanical Works
Offshore bracket cutting works on foundations at the Gode Wind 3 offshore wind farm for RT9.
Wyzwanie
Temporary steel brackets left on offshore structures after installation must be removed safely, without damaging the structure or its coating.
Rozwiązanie
Ventum carried out offshore bracket cutting on Gode Wind 3 for RT9, working at height and over water with suitable access methods and cutting equipment.
Rezultaty
Brackets removed safely and the structures handed over clean for the next stage of the project.
Zobacz podobne projekty
Gode Wind 3 – Offshore Mechanical Works
Offshore bracket cutting works on foundations at the Gode Wind 3 offshore wind farm for RT9.
Belwind – Offshore Service and Blade Repair
Offshore turbine service and blade repair works at the Belwind offshore wind farm for GE Vernova.
Prinses Amalia – Major Component Exchange
Major component exchange works at the Prinses Amalia offshore wind farm for Deutsche Windtechnik.


