Installation of Bird Monitoring System Components for Baltic Power Offshore Wind Farm
In 2025, we supported DHI with installing components of their bird monitoring system for the Baltic Power Offshore Wind Farm.

Challenge
The work took place at Smulders’ fabrication facility in Newcastle. Our team installed electrical cabinets, routed and terminated cables, and integrated the system into multiple Transition Pieces (TPs).
Solution
Collaboration with DHI engineers and Smulders’ site personnel ensured all work met offshore specifications and was ready for deployment.
Results
This project showcases our expertise in electrical pre-commissioning and our flexibility to work in fabrication yard environments supporting offshore technology deployments.
Check similar projects
Gode Wind 3 – Offshore Mechanical Works
Offshore bracket cutting works on foundations at the Gode Wind 3 offshore wind farm for RT9.
Belwind – Offshore Service and Blade Repair
Offshore turbine service and blade repair works at the Belwind offshore wind farm for GE Vernova.
Prinses Amalia – Major Component Exchange
Major component exchange works at the Prinses Amalia offshore wind farm for Deutsche Windtechnik.