Offshore blade dismantling
As older turbine components reached end-of-life, Ventum was awarded a contract to dismantle blades requiring major maintenance at the Arklow Offshore Wind Farm in Ireland.
The project was scheduled for summer 2025, using a jack-up vessel equipped with a crane to remove and safely store blades on deck-mounted racks.
We look forward to returning to Ireland, onshore or offshore, as we continue keeping the world spinning.

Challenge
Close planning with the client and thorough site preparation laid the groundwork. The team established a strong work pace from the outset, earning consistent positive feedback from the client’s supervisors. Offshore conditions brought frequent weather-related downtime, but our team made use of this time for preparatory work, ensuring efficient execution once operations resumed
Solution
A dedicated eight-person Ventum team handled the operation—HSE Supervisor, lifting supervisors, MCE technicians, and rope access professionals provided full-scope support.
Results
All 18 blades were successfully dismantled by mid-July 2025 through coordinated effort between Ventum and the client’s team.
Check similar projects
Blade Inspections and LPS Investigation at Potęgowo Wind Farm
In 2023, we completed a blade inspection and LPS investigation campaign for Mashav at the Potęgowo Wind Farm.
Rope Access Blade Inspections for QAIR in Poland
In 2023, we delivered blade inspection services for QAIR on 26 Vestas wind turbines across Poland.
Blade Repair Campaign on Fuhrländer Turbines in Northern Poland
In 2025, Ventum delivered a blade repair campaign for Energa on Fuhrländer turbines operating in northern Poland.