Baltic Power – Commissioning, HV Control and Electrical Works
Electrical
Poland

Baltic Power – Commissioning, HV Control and Electrical Works

CLIENT
Baltic Power (Orlen and Northland Power)
WHEN
2025–2026
WHERE
Poland
SCOPE

Commissioning personnel, HV control engineering, LV measurements and network equipment installation for Baltic Power.

Poland

Challenge

Moving from construction to energisation requires qualified electrical people who can work safely on HV systems, follow switching procedures and support the commissioning programme alongside the owner's own engineers.

Solution

Ventum provided an HV control engineer and commissioning personnel to support Baltic Power's commissioning team. We also carried out low-voltage electrical measurements and installed network equipment as part of the project's technical scope.

Results

The owner gained qualified electrical capacity at the most critical stage of the project, helping bring the wind farm safely from construction into operation.