Baltic Power – Commissioning, HV Control and Electrical Works
Commissioning personnel, HV control engineering, LV measurements and network equipment installation for Baltic Power.

Wyzwanie
Moving from construction to energisation requires qualified electrical people who can work safely on HV systems, follow switching procedures and support the commissioning programme alongside the owner's own engineers.
Rozwiązanie
Ventum provided an HV control engineer and commissioning personnel to support Baltic Power's commissioning team. We also carried out low-voltage electrical measurements and installed network equipment as part of the project's technical scope.
Rezultaty
The owner gained qualified electrical capacity at the most critical stage of the project, helping bring the wind farm safely from construction into operation.
Zobacz podobne projekty
Gode Wind 3 – Offshore Mechanical Works
Offshore bracket cutting works on foundations at the Gode Wind 3 offshore wind farm for RT9.
Belwind – Offshore Service and Blade Repair
Offshore turbine service and blade repair works at the Belwind offshore wind farm for GE Vernova.
Prinses Amalia – Major Component Exchange
Major component exchange works at the Prinses Amalia offshore wind farm for Deutsche Windtechnik.